{"id":223824,"date":"2022-05-11T08:43:19","date_gmt":"2022-05-11T06:43:19","guid":{"rendered":"https:\/\/villarrealcf.es\/\/roig-this-stadium-represents-the-link-between-the-club-and-the-town\/"},"modified":"2022-11-29T14:14:18","modified_gmt":"2022-11-29T13:14:18","slug":"roig-this-stadium-represents-the-link-between-the-club-and-the-town","status":"publish","type":"post","link":"https:\/\/villarrealcf.es\/en\/roig-this-stadium-represents-the-link-between-the-club-and-the-town\/","title":{"rendered":"&#8220;The stadium represents the ties between the club and town&#8221;"},"content":{"protected":false,"blocks":[{"type":"image","url":"https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","alt":"||||||","width":1653,"height":929,"srcset":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1653w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1024x575.jpg 1024w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1536x863.jpg 1536w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-32x18.jpg 32w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-150x84.jpg 150w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1200x674.jpg 1200w","sizes":"auto, (max-width: 1653px) 100vw, 1653px"},{"type":"paragraph","text":"The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real"},{"type":"paragraph","text":"Villarreal CF president Fernando Roig appeared in front of the media alongside Vila-real mayor Jos\u00e9 Belloch and C\u00e9sar Azc\u00e1rate, representative from engineering company IDOM, to announce the changes that will make up the important transformation of the Estadio de la Cer\u00e1mica. The event took place at the El Ceramista Restaurant, with Roig underlining: \u201cIt\u2019s extremely satisfying to reach 100 years and have a great stadium in this brilliant town. The city has always improved alongside Villarreal, and this will be the culmination. The match against Liverpool was the culmination of the link between the team and the fans, and this is the culmination between the club, the town. And the province.\u201d Benlloch added: \u201cThis is a great day for Vila-real and for the whole province, as the town is intrinsically linked to sport, as possibly the town in Europe with most football pitches per inhabitant.\u201d"},{"type":"paragraph","text":"Constant growth"},{"type":"paragraph","text":"As the president underlined, \u201cVillarreal is always growing. We started in the 1997\/98 season. During all of the refurbishments, we have never stopped playing at our stadium, but now, the size of the works doesn\u2019t allow it, so we\u2019ve capitalised on having the World Cup this year. In 2005, we did a refurbishment before playing in the Champinos League. In 2009, we reformed the away stand, and in 2017, we unveiled the Estadio de la Cer\u00e1mica. Later, in 2019, thanks to the collaboration of the Fundaci\u00f3n Hortensia Herrero and Mercadona, two sculptures made by Jaume Plensa were installed in the square outside the stadium.\u201d Now, in the club\u2019s centenary, and celebrating 25 years since the president arrived, Villarreal will unveil a spectacular stadium, which will cost between \u201c30 and 35 million euros,\u201d depending on the final cost of the materials."},{"type":"paragraph","text":"The club, as well as the company in charge of the project, underlined that the works will start after the last home match of the season, which will take place on Sunday at 6:30pm CEST against Real Sociedad, a match where the president asked for the fans to support the team as they try and get into Europe next season. These works will finish completely before Villareal\u2019s centenary, although fans will be able to enter safely from Matchday 15, the last game of 2022, and the first after the World Cup."}],"structured":{"summary":{"text":"The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real Villarreal CF president Fernando Roig appeared in front of the media alongside Vila-real mayor Jos\u00e9 Belloch and C\u00e9sar Azc\u00e1rate, representative from engineering company IDOM, to announce the changes that will make up the important transformation of the Estadio de la Cer\u00e1mica. The event took place at the El Ceramista Restaurant, with Roig underlining: \u201cIt\u2019s extremely satisfying to reach 100 years and have a great stadium in this brilliant town. The city has always improved alongside Villarreal, and this will be the culmination. The match against Liverpool was the culmination of the link between the team and the fans, and this is the culmination between the club, the town. And the province.\u201d Benlloch added: \u201cThis is a great day for Vila-real and for the whole province, as the town is intrinsically linked to sport, as possibly the town in Europe with most football pitches per inhabitant.\u201d Constant growth As the president underlined, \u201cVillarreal is always growing. We started in the 1997\/98 season. During all of the refurbishments, we have never stopped playing at our stadium, but now, the size of the works doesn\u2019t allow it, so we\u2019ve capitalised on having the World Cup this year. In 2005, we did a refurbishment before playing in the Champinos League. In 2009, we reformed the away stand, and in 2017, we unveiled the Estadio de la Cer\u00e1mica. Later, in 2019, thanks to the collaboration of the Fundaci\u00f3n Hortensia Herrero and Mercadona, two sculptures made by Jaume Plensa were installed in the square outside the stadium.\u201d Now, in the club\u2019s centenary, and celebrating 25 years since the president arrived, Villarreal will unveil a spectacular stadium, which will cost between \u201c30 and 35 million euros,\u201d depending on the final cost of the materials. The club, as well as the company in charge of the project, underlined that the works will start after the last home match of the season, which will take place on Sunday at 6:30pm CEST against Real Sociedad, a match where the president asked for the fans to support the team as they try and get into Europe next season. These works will finish completely before Villareal\u2019s centenary, although fans will be able to enter safely from Matchday 15, the last game of 2022, and the first after the World Cup.","headings":[],"buttons":[],"images":[{"type":"image","url":"https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","alt":"||||||","width":1653,"height":929,"srcset":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1653w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1024x575.jpg 1024w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1536x863.jpg 1536w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-32x18.jpg 32w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-150x84.jpg 150w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1200x674.jpg 1200w","sizes":"auto, (max-width: 1653px) 100vw, 1653px"}],"counts":{"blocks":6,"headings":0,"texts":5,"buttons":0,"images":1}},"sections":[{"id":"section-1","title":"","text":"The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real Villarreal CF president Fernando Roig appeared in front of the media alongside Vila-real mayor Jos\u00e9 Belloch and C\u00e9sar Azc\u00e1rate, representative from engineering company IDOM, to announce the changes that will make up the important transformation of the Estadio de la Cer\u00e1mica. The event took place at the El Ceramista Restaurant, with Roig underlining: \u201cIt\u2019s extremely satisfying to reach 100 years and have a great stadium in this brilliant town. The city has always improved alongside Villarreal, and this will be the culmination. The match against Liverpool was the culmination of the link between the team and the fans, and this is the culmination between the club, the town. And the province.\u201d Benlloch added: \u201cThis is a great day for Vila-real and for the whole province, as the town is intrinsically linked to sport, as possibly the town in Europe with most football pitches per inhabitant.\u201d Constant growth As the president underlined, \u201cVillarreal is always growing. We started in the 1997\/98 season. During all of the refurbishments, we have never stopped playing at our stadium, but now, the size of the works doesn\u2019t allow it, so we\u2019ve capitalised on having the World Cup this year. In 2005, we did a refurbishment before playing in the Champinos League. In 2009, we reformed the away stand, and in 2017, we unveiled the Estadio de la Cer\u00e1mica. Later, in 2019, thanks to the collaboration of the Fundaci\u00f3n Hortensia Herrero and Mercadona, two sculptures made by Jaume Plensa were installed in the square outside the stadium.\u201d Now, in the club\u2019s centenary, and celebrating 25 years since the president arrived, Villarreal will unveil a spectacular stadium, which will cost between \u201c30 and 35 million euros,\u201d depending on the final cost of the materials. The club, as well as the company in charge of the project, underlined that the works will start after the last home match of the season, which will take place on Sunday at 6:30pm CEST against Real Sociedad, a match where the president asked for the fans to support the team as they try and get into Europe next season. These works will finish completely before Villareal\u2019s centenary, although fans will be able to enter safely from Matchday 15, the last game of 2022, and the first after the World Cup.","headings":[],"texts":[{"type":"paragraph","text":"The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real"},{"type":"paragraph","text":"Villarreal CF president Fernando Roig appeared in front of the media alongside Vila-real mayor Jos\u00e9 Belloch and C\u00e9sar Azc\u00e1rate, representative from engineering company IDOM, to announce the changes that will make up the important transformation of the Estadio de la Cer\u00e1mica. The event took place at the El Ceramista Restaurant, with Roig underlining: \u201cIt\u2019s extremely satisfying to reach 100 years and have a great stadium in this brilliant town. The city has always improved alongside Villarreal, and this will be the culmination. The match against Liverpool was the culmination of the link between the team and the fans, and this is the culmination between the club, the town. And the province.\u201d Benlloch added: \u201cThis is a great day for Vila-real and for the whole province, as the town is intrinsically linked to sport, as possibly the town in Europe with most football pitches per inhabitant.\u201d"},{"type":"paragraph","text":"Constant growth"},{"type":"paragraph","text":"As the president underlined, \u201cVillarreal is always growing. We started in the 1997\/98 season. During all of the refurbishments, we have never stopped playing at our stadium, but now, the size of the works doesn\u2019t allow it, so we\u2019ve capitalised on having the World Cup this year. In 2005, we did a refurbishment before playing in the Champinos League. In 2009, we reformed the away stand, and in 2017, we unveiled the Estadio de la Cer\u00e1mica. Later, in 2019, thanks to the collaboration of the Fundaci\u00f3n Hortensia Herrero and Mercadona, two sculptures made by Jaume Plensa were installed in the square outside the stadium.\u201d Now, in the club\u2019s centenary, and celebrating 25 years since the president arrived, Villarreal will unveil a spectacular stadium, which will cost between \u201c30 and 35 million euros,\u201d depending on the final cost of the materials."},{"type":"paragraph","text":"The club, as well as the company in charge of the project, underlined that the works will start after the last home match of the season, which will take place on Sunday at 6:30pm CEST against Real Sociedad, a match where the president asked for the fans to support the team as they try and get into Europe next season. These works will finish completely before Villareal\u2019s centenary, although fans will be able to enter safely from Matchday 15, the last game of 2022, and the first after the World Cup."}],"buttons":[],"images":[{"type":"image","url":"https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","alt":"||||||","width":1653,"height":929,"srcset":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1653w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1024x575.jpg 1024w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1536x863.jpg 1536w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-32x18.jpg 32w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-150x84.jpg 150w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1200x674.jpg 1200w","sizes":"auto, (max-width: 1653px) 100vw, 1653px"}],"widgets":[],"blocks":[{"type":"image","url":"https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","alt":"||||||","width":1653,"height":929,"srcset":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1653w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1024x575.jpg 1024w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1536x863.jpg 1536w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-32x18.jpg 32w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-150x84.jpg 150w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1200x674.jpg 1200w","sizes":"auto, (max-width: 1653px) 100vw, 1653px"},{"type":"paragraph","text":"The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real"},{"type":"paragraph","text":"Villarreal CF president Fernando Roig appeared in front of the media alongside Vila-real mayor Jos\u00e9 Belloch and C\u00e9sar Azc\u00e1rate, representative from engineering company IDOM, to announce the changes that will make up the important transformation of the Estadio de la Cer\u00e1mica. The event took place at the El Ceramista Restaurant, with Roig underlining: \u201cIt\u2019s extremely satisfying to reach 100 years and have a great stadium in this brilliant town. The city has always improved alongside Villarreal, and this will be the culmination. The match against Liverpool was the culmination of the link between the team and the fans, and this is the culmination between the club, the town. And the province.\u201d Benlloch added: \u201cThis is a great day for Vila-real and for the whole province, as the town is intrinsically linked to sport, as possibly the town in Europe with most football pitches per inhabitant.\u201d"},{"type":"paragraph","text":"Constant growth"},{"type":"paragraph","text":"As the president underlined, \u201cVillarreal is always growing. We started in the 1997\/98 season. During all of the refurbishments, we have never stopped playing at our stadium, but now, the size of the works doesn\u2019t allow it, so we\u2019ve capitalised on having the World Cup this year. In 2005, we did a refurbishment before playing in the Champinos League. In 2009, we reformed the away stand, and in 2017, we unveiled the Estadio de la Cer\u00e1mica. Later, in 2019, thanks to the collaboration of the Fundaci\u00f3n Hortensia Herrero and Mercadona, two sculptures made by Jaume Plensa were installed in the square outside the stadium.\u201d Now, in the club\u2019s centenary, and celebrating 25 years since the president arrived, Villarreal will unveil a spectacular stadium, which will cost between \u201c30 and 35 million euros,\u201d depending on the final cost of the materials."},{"type":"paragraph","text":"The club, as well as the company in charge of the project, underlined that the works will start after the last home match of the season, which will take place on Sunday at 6:30pm CEST against Real Sociedad, a match where the president asked for the fans to support the team as they try and get into Europe next season. These works will finish completely before Villareal\u2019s centenary, although fans will be able to enter safely from Matchday 15, the last game of 2022, and the first after the World Cup."}]}],"hero":{"id":"section-1","title":"","text":"The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real Villarreal CF president Fernando Roig appeared in front of the media alongside Vila-real mayor Jos\u00e9 Belloch and C\u00e9sar Azc\u00e1rate, representative from engineering company IDOM, to announce the changes that will make up the important transformation of the Estadio de la Cer\u00e1mica. The event took place at the El Ceramista Restaurant, with Roig underlining: \u201cIt\u2019s extremely satisfying to reach 100 years and have a great stadium in this brilliant town. The city has always improved alongside Villarreal, and this will be the culmination. The match against Liverpool was the culmination of the link between the team and the fans, and this is the culmination between the club, the town. And the province.\u201d Benlloch added: \u201cThis is a great day for Vila-real and for the whole province, as the town is intrinsically linked to sport, as possibly the town in Europe with most football pitches per inhabitant.\u201d Constant growth As the president underlined, \u201cVillarreal is always growing. We started in the 1997\/98 season. During all of the refurbishments, we have never stopped playing at our stadium, but now, the size of the works doesn\u2019t allow it, so we\u2019ve capitalised on having the World Cup this year. In 2005, we did a refurbishment before playing in the Champinos League. In 2009, we reformed the away stand, and in 2017, we unveiled the Estadio de la Cer\u00e1mica. Later, in 2019, thanks to the collaboration of the Fundaci\u00f3n Hortensia Herrero and Mercadona, two sculptures made by Jaume Plensa were installed in the square outside the stadium.\u201d Now, in the club\u2019s centenary, and celebrating 25 years since the president arrived, Villarreal will unveil a spectacular stadium, which will cost between \u201c30 and 35 million euros,\u201d depending on the final cost of the materials. The club, as well as the company in charge of the project, underlined that the works will start after the last home match of the season, which will take place on Sunday at 6:30pm CEST against Real Sociedad, a match where the president asked for the fans to support the team as they try and get into Europe next season. These works will finish completely before Villareal\u2019s centenary, although fans will be able to enter safely from Matchday 15, the last game of 2022, and the first after the World Cup.","headings":[],"texts":[{"type":"paragraph","text":"The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real"},{"type":"paragraph","text":"Villarreal CF president Fernando Roig appeared in front of the media alongside Vila-real mayor Jos\u00e9 Belloch and C\u00e9sar Azc\u00e1rate, representative from engineering company IDOM, to announce the changes that will make up the important transformation of the Estadio de la Cer\u00e1mica. The event took place at the El Ceramista Restaurant, with Roig underlining: \u201cIt\u2019s extremely satisfying to reach 100 years and have a great stadium in this brilliant town. The city has always improved alongside Villarreal, and this will be the culmination. The match against Liverpool was the culmination of the link between the team and the fans, and this is the culmination between the club, the town. And the province.\u201d Benlloch added: \u201cThis is a great day for Vila-real and for the whole province, as the town is intrinsically linked to sport, as possibly the town in Europe with most football pitches per inhabitant.\u201d"},{"type":"paragraph","text":"Constant growth"},{"type":"paragraph","text":"As the president underlined, \u201cVillarreal is always growing. We started in the 1997\/98 season. During all of the refurbishments, we have never stopped playing at our stadium, but now, the size of the works doesn\u2019t allow it, so we\u2019ve capitalised on having the World Cup this year. In 2005, we did a refurbishment before playing in the Champinos League. In 2009, we reformed the away stand, and in 2017, we unveiled the Estadio de la Cer\u00e1mica. Later, in 2019, thanks to the collaboration of the Fundaci\u00f3n Hortensia Herrero and Mercadona, two sculptures made by Jaume Plensa were installed in the square outside the stadium.\u201d Now, in the club\u2019s centenary, and celebrating 25 years since the president arrived, Villarreal will unveil a spectacular stadium, which will cost between \u201c30 and 35 million euros,\u201d depending on the final cost of the materials."},{"type":"paragraph","text":"The club, as well as the company in charge of the project, underlined that the works will start after the last home match of the season, which will take place on Sunday at 6:30pm CEST against Real Sociedad, a match where the president asked for the fans to support the team as they try and get into Europe next season. These works will finish completely before Villareal\u2019s centenary, although fans will be able to enter safely from Matchday 15, the last game of 2022, and the first after the World Cup."}],"buttons":[],"images":[{"type":"image","url":"https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","alt":"||||||","width":1653,"height":929,"srcset":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1653w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1024x575.jpg 1024w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1536x863.jpg 1536w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-32x18.jpg 32w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-150x84.jpg 150w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1200x674.jpg 1200w","sizes":"auto, (max-width: 1653px) 100vw, 1653px"}],"widgets":[],"blocks":[{"type":"image","url":"https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","alt":"||||||","width":1653,"height":929,"srcset":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1653w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1024x575.jpg 1024w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1536x863.jpg 1536w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-32x18.jpg 32w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-150x84.jpg 150w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1200x674.jpg 1200w","sizes":"auto, (max-width: 1653px) 100vw, 1653px"},{"type":"paragraph","text":"The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real"},{"type":"paragraph","text":"Villarreal CF president Fernando Roig appeared in front of the media alongside Vila-real mayor Jos\u00e9 Belloch and C\u00e9sar Azc\u00e1rate, representative from engineering company IDOM, to announce the changes that will make up the important transformation of the Estadio de la Cer\u00e1mica. The event took place at the El Ceramista Restaurant, with Roig underlining: \u201cIt\u2019s extremely satisfying to reach 100 years and have a great stadium in this brilliant town. The city has always improved alongside Villarreal, and this will be the culmination. The match against Liverpool was the culmination of the link between the team and the fans, and this is the culmination between the club, the town. And the province.\u201d Benlloch added: \u201cThis is a great day for Vila-real and for the whole province, as the town is intrinsically linked to sport, as possibly the town in Europe with most football pitches per inhabitant.\u201d"},{"type":"paragraph","text":"Constant growth"},{"type":"paragraph","text":"As the president underlined, \u201cVillarreal is always growing. We started in the 1997\/98 season. During all of the refurbishments, we have never stopped playing at our stadium, but now, the size of the works doesn\u2019t allow it, so we\u2019ve capitalised on having the World Cup this year. In 2005, we did a refurbishment before playing in the Champinos League. In 2009, we reformed the away stand, and in 2017, we unveiled the Estadio de la Cer\u00e1mica. Later, in 2019, thanks to the collaboration of the Fundaci\u00f3n Hortensia Herrero and Mercadona, two sculptures made by Jaume Plensa were installed in the square outside the stadium.\u201d Now, in the club\u2019s centenary, and celebrating 25 years since the president arrived, Villarreal will unveil a spectacular stadium, which will cost between \u201c30 and 35 million euros,\u201d depending on the final cost of the materials."},{"type":"paragraph","text":"The club, as well as the company in charge of the project, underlined that the works will start after the last home match of the season, which will take place on Sunday at 6:30pm CEST against Real Sociedad, a match where the president asked for the fans to support the team as they try and get into Europe next season. These works will finish completely before Villareal\u2019s centenary, although fans will be able to enter safely from Matchday 15, the last game of 2022, and the first after the World Cup."}]}},"sections":[{"id":"section-1","title":"","text":"The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real Villarreal CF president Fernando Roig appeared in front of the media alongside Vila-real mayor Jos\u00e9 Belloch and C\u00e9sar Azc\u00e1rate, representative from engineering company IDOM, to announce the changes that will make up the important transformation of the Estadio de la Cer\u00e1mica. The event took place at the El Ceramista Restaurant, with Roig underlining: \u201cIt\u2019s extremely satisfying to reach 100 years and have a great stadium in this brilliant town. The city has always improved alongside Villarreal, and this will be the culmination. The match against Liverpool was the culmination of the link between the team and the fans, and this is the culmination between the club, the town. And the province.\u201d Benlloch added: \u201cThis is a great day for Vila-real and for the whole province, as the town is intrinsically linked to sport, as possibly the town in Europe with most football pitches per inhabitant.\u201d Constant growth As the president underlined, \u201cVillarreal is always growing. We started in the 1997\/98 season. During all of the refurbishments, we have never stopped playing at our stadium, but now, the size of the works doesn\u2019t allow it, so we\u2019ve capitalised on having the World Cup this year. In 2005, we did a refurbishment before playing in the Champinos League. In 2009, we reformed the away stand, and in 2017, we unveiled the Estadio de la Cer\u00e1mica. Later, in 2019, thanks to the collaboration of the Fundaci\u00f3n Hortensia Herrero and Mercadona, two sculptures made by Jaume Plensa were installed in the square outside the stadium.\u201d Now, in the club\u2019s centenary, and celebrating 25 years since the president arrived, Villarreal will unveil a spectacular stadium, which will cost between \u201c30 and 35 million euros,\u201d depending on the final cost of the materials. The club, as well as the company in charge of the project, underlined that the works will start after the last home match of the season, which will take place on Sunday at 6:30pm CEST against Real Sociedad, a match where the president asked for the fans to support the team as they try and get into Europe next season. These works will finish completely before Villareal\u2019s centenary, although fans will be able to enter safely from Matchday 15, the last game of 2022, and the first after the World Cup.","url":"","background_image":"","images":[{"type":"image","url":"https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","alt":"||||||","width":1653,"height":929,"srcset":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1653w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1024x575.jpg 1024w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1536x863.jpg 1536w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-32x18.jpg 32w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-150x84.jpg 150w, https:\/\/villarrealcf.es\/\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg 1920w, https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1200x674.jpg 1200w","sizes":"auto, (max-width: 1653px) 100vw, 1653px"}],"videos":[],"links":[]},{"id":"shortcode-caption-69d4ee1e028b6","type":"shortcode","shortcode":"caption","attributes":{"id":"attachment_184044","align":"alignnone","width":""},"title":"Caption","rendered":"","data":[],"text":"","url":"","background_image":"","images":[],"videos":[],"links":[],"blocks":[]}]},"excerpt":{"rendered":"The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real","protected":false},"author":1,"featured_media":184044,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[13485],"tags":[8815,7204,13526,5150,9074,4865],"acf":null,"lang":"en","formatted_date":"May 11, 2022","modified_date":"November 29, 2022","permalink":"https:\/\/villarrealcf.es\/en\/roig-this-stadium-represents-the-link-between-the-club-and-the-town\/","reading_time":3,"featured_media_data":{"id":184044,"title":"||||||","caption":"||||||","alt_text":"","description":"","mime_type":"image\/jpeg","source_url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","sizes":{"thumbnail":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-150x150.jpg","width":150,"height":150},"medium":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-300x169.jpg","width":300,"height":169},"medium_large":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-768x432.jpg","width":768,"height":432},"large":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1024x575.jpg","width":788,"height":442},"1536x1536":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1536x863.jpg","width":1536,"height":863},"2048x2048":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","width":1653,"height":929},"tp-image-grid":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-700x700.jpg","width":700,"height":700},"size-bunyad-medium":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","width":1653,"height":929},"sportspress-crop-medium":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-300x300.jpg","width":300,"height":300},"sportspress-fit-medium":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-300x169.jpg","width":300,"height":169},"sportspress-fit-icon":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-128x72.jpg","width":128,"height":72},"sportspress-fit-mini":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-32x18.jpg","width":32,"height":18},"bunyad-small":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-150x84.jpg","width":150,"height":84},"bunyad-medium":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-450x253.jpg","width":450,"height":253},"bunyad-full":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-1200x674.jpg","width":1200,"height":674},"bunyad-viewport":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","width":1653,"height":929},"bunyad-768":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280-768x432.jpg","width":768,"height":432},"full":{"url":"https:\/\/villarrealcf.es\/wp-content\/uploads\/2022\/05\/47643b83fc91808ba887ba9db2ce1280.jpg","width":1653,"height":929}}},"author_data":{"id":"1","name":"root_envidea","first_name":"Villarreal CF","last_name":"","description":"","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/48f95f42a3ccc324f3a3458e4b9e6fb070b083e99d388e170c1afb061fa99b63?s=96&d=mm&r=g","acf":null},"taxonomies_data":{"category":[{"id":13485,"name":"Club","slug":"club","acf":null}],"post_tag":[{"id":8815,"name":"El Ceramista","slug":"el-ceramista","acf":null},{"id":7204,"name":"Estadio de la Cer\u00e1mica","slug":"estadio-de-la-ceramica","acf":null},{"id":13526,"name":"Fernando Roig","slug":"fernando-roig-en","acf":null},{"id":5150,"name":"Submarino Amarillo","slug":"submarino-amarillo","acf":null},{"id":9074,"name":"Transformaci\u00f3n Estadio de la Cer\u00e1mica","slug":"transformacion-estadio-de-la-ceramica","acf":null},{"id":4865,"name":"Villarreal CF","slug":"villarreal-cf","acf":null}],"translation_priority":[{"id":734,"name":"Optional","slug":"optional-en","acf":null}]},"seo_full":{"native":{"title":"&#8220;The stadium represents the ties between the club and town&#8221; - Web Oficial del Villarreal CF","description":"[caption id=\"attachment_184044\" align=\"alignnone\" width=\"\"]||||||[\/caption]The Villarreal president underlined the importance that the transformation of La Cer\u00e1mica will have for Vila-real Villarreal&hellip;","canonical":"https:\/\/villarrealcf.es\/en\/roig-this-stadium-represents-the-link-between-the-club-and-the-town\/"}},"_links":{"self":[{"href":"https:\/\/villarrealcf.es\/en\/wp-json\/wp\/v2\/posts\/223824","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/villarrealcf.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/villarrealcf.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/villarrealcf.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/villarrealcf.es\/en\/wp-json\/wp\/v2\/comments?post=223824"}],"version-history":[{"count":0,"href":"https:\/\/villarrealcf.es\/en\/wp-json\/wp\/v2\/posts\/223824\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/villarrealcf.es\/en\/wp-json\/wp\/v2\/media\/184044"}],"wp:attachment":[{"href":"https:\/\/villarrealcf.es\/en\/wp-json\/wp\/v2\/media?parent=223824"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/villarrealcf.es\/en\/wp-json\/wp\/v2\/categories?post=223824"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/villarrealcf.es\/en\/wp-json\/wp\/v2\/tags?post=223824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}